- Home
- Departments
- Environmental Control
- Environmental Control Documents
Environmental Control Documents
- Amended FEIS Main Text Suffolk Technology August 2025
- Appendix A - Hearing Transcripts
- Appendix B - Involved Agency Comments
- Appendix C - Public Written Comments UPDATED
- Appendix D - Applicant Community Benefit Commitments
- Appendix E-1 - Pinelawn Correspondence
- Appendix E-2 - Pinelawn Cemetery Lot 2 Conc Imp Plan
- Appendix E-3 Park Entrance Modified Plan
- Appendix E-4 - Anticipated Survey Dedication Areas 2025_01_10
- Appendix F - Revised Signal Warrant Analysis - Little East Neck Road at Site Driveway
- Appendix G-1 - Cross Sections
- Appendix G-2 - Photo Simulations
- Appendix H-1 SC Capital Budget for Sewering
- Appendix H-2 Town DPW Drainage Input
- Appendix I-1 USFWS Comment Letter
- Appendix I-2 NYS Natural Heritage Program Letter
- Appendix I-3 Edgewood Env Consulting LLC Mist Net and Acoustic Bat Survey
- Appendix I-4 NYSDEC Art 11 App and Letter of No Jurisdiction Endangered Species Act
- Attachment 1 - Preferred Plan Overalls Only
- Attachment 2 - Landscape Plan 2024_12_13
- Attachment 3 - Site Plan Rendering 2024_12_18
/QuickLinks.aspx
- DEIS Main Text 10-09-2024
- Newspaper Publication
- APPENDIX A-1 FEAF Part 1
- APPENDIX A-2 2024_3_37 Positive Dec and ENB Notice
- APPENDIX A-3 Final Scope and Resolution
- APPENDIX A-4 Draft RIP-2 Zoning Code
- APPENDIX A-5 Industrial Use Summaries
- APPENDIX B-1 2023 Pinelawn New York State Cemetery Board Resolution
- APPENDIX B-2 Cemetery Board Submission Materials
- APPENDIX B-3 Article 15 of Not for Profit Law Section 150 6e Lease of Cemetery Lands
- APPENDIX C Economic Fiscal Analysis 2024-08-23
- Traffic APPENDIX A Existing Traffic Volumes
- Traffic APPENDIX B Trip Generation Data - Revised October 2024
- Traffic APPENDIX C Level of Service Definitions
- Traffic APPENDIX D Capacity Analysis - Revised October 2024
- Traffic APPENDIX E Conceptual Plans - Revised October 2024
- Traffic Impact Study Suffolk Technology Park October 2024 Final Tracked
- Traffic Impact Study Suffolk Technology Park October 2024 FINAL Clean
- APPENDIX E-1 Sewer Agency Concept Approval Minutes February 5, 2024
- APPENDIX E-2-2023_9 NP Sewer Feasibility Report
- APPENDIX E-3 Sewer Connection Engineering Design Report
- APPENDIX F Geotechnical Report
- APPENDIX G Phase I ESA
- APPENDIX H Drinking Water Quality Data
- APPENDIX I-1 SONIR Manual Suffolk Tech Park
- APPENDIX I-2 SONIR Existing Conditions
- APPENDIX I-3 SONIR Proposed Conditions
- APPENDIX J Community Services Correspondence
- APPENDIX K-1 Breeding Birds Atlas
- APPENDIX K-2 Ecology Correspondence
- APPENDIX K-3 Ecological Investigation Report
- APPENDIX L-1 Tracker Phase I CRA_Feb 2024
- APPENDIX L-2 OPRHP Finding of No Significance
- APPENDIX M - Noise Analysis
- APPENDIX N-1 Existing Site Conditions Photographs
- APPENDIX N-2 Building Elevations and Renderings
- APPENDIX N-3 Key Map and Cross Sections AA and BB
- APPENDIX N-4 Visual Impact Study 8-23-2024
- Figures 1-1 Location
- Figures 1-2 Aerial
- Figures 1-3 Sewer Districts
- Figures 2-1 Topo
- Figures 2-2 Soils
- Figures 2-3a Water Table Contour
- Figures 2-3b Water Supply Sensitive Area Downgradient
- Figure 2-4 NYSDEC Freshwater Wetlands
- Figures 2-5 NWI
- Figures 2-6 FEMA
- Figures 2-7 SSEReserve
- Figures 2-8 GeoXS
- Figures 2-9 Existing Habitat
- Figures 2-10 Proposed Habitat Map
- Figures 3-1 Land Use
- Figures 3-2 Zoning
- Figures 3-2b Proposed Zoning
- Figures 3-3 Community Services - Schools
- Figures 3-4a Fire Districts
- Figures 3-4b Police Districts
- Figures 3-5 Water Supply
- Figures 3-6 CRIS
- Figures 3-7 EnvJustice
- Figures 5-1 Pinelawn Cemetery Overlay Option 2.4
- Figures - All
- PLANS - 2024-01-31 Suffolk Tech Rendered Concept Plan
- PLANS - 2024-01-31 Suffolk Tech Renderings and Elevations
- PLANS - 21022_Suff Tech Landscape Plan Reduced Set 2024-01-30
- PLANS - 2024-2-2 Site Plan Overall Sheets Set
- PLANS - 2024-07-02 Preferred Alternative Rendered Plan
- PLANS - 2024-07-03 Preferred Alternative Site Plan Set Bohler Overalls Only
- PLANS - 2024-07-02 Landscape Plan NPV
- PLANS - 2024-7-3 Conceptual Park Access Plan NPV
- PLANS - Little East Neck Road Intersection Conceptual Improvements Plans
/QuickLinks.aspx
- Accepted Final Environmental Impact Statement for the Bristol Suffolk LLC Project at Wyandanch, NY
- Accepted Draft Environmental Impact Statement for the Bristol Suffolk LLC Project at Wyandanch, NY
- Bristol Suffolk Tech Accepted DEIS & FEIS Documents
- 2026 Recycling Calendar (PDF)
- Do I need a NYSDEC Wetlands Permit?
- Adoption of Final Scope for Pinelawn Suffolk Tech (PDF)
- NYS DEC Property Info Viewer
- NYS Department of Environmental Conservation
- Oak Beach Drinking Water 2022 Annual Report (PDF)
- Oak Beach Drinking Water 2020 Annual Report (PDF)
- Stormwater Management Program (PDF)
- Stormwater Management Plan 2022
- Stormwater Management Program Plan 2020-2021 (PDF)
- Stormwater Management Program Plan Update 2018 (PDF)
- Stormwater Runoff Info and Video Link (PDF)
- Residential Stormwater Reduction (PDF)
- Environmental Determination on Composition and Placement of Fill (PDF)
- Town of Babylon 2020 -2021 MS4 Annual Report
- Appendix I Inventory Report (PDF)
- Kayak Blueway Trail (PDF)
/QuickLinks.aspx